Skip to content

04.11.2020

Traffic during bridge project

The bridge demolition phase 1 will start on 9.11.2020 at 8 am and end on 13.11.2020 at 4 pm. The port traffic will operate normally throughout the bridge project.

Stevedoring somessa!

Seuraa meitä sosiaalisessa mediassa